March 1, 1986
The college stopped payment to the firm that designed and built the Seeley G. Mudd Chemistry Building due to energy conservation problems in the structure and design of the building.
The college stopped payment to the firm that designed and built the Seeley G. Mudd Chemistry Building due to energy conservation problems in the structure and design of the building.